MV BREAKER TRIP ABB — Total MV Supply Loss

At a glance

Severity
FAULT STOP
Domain
MV_SUBSTATION_SYSTEM
Reference standard
CEI 0-16 / EN 50600-2-2
Product / context
MV breaker intervention

What it means

Total loss of the MV supply: the load moves to the UPS and the generators must start. How the next minutes are managed decides the outcome of the event.

Probable causes

Where to start

Immediately check BMS/switchboards: are UPS systems supporting load on battery, have generators started and have ATS switches transferred?

Full guided diagnosis in the app

The diagnostic tree for this fault has 5 guided steps with measurements, checks and resolutions. You'll find it in DataCIQ, one of the five IndexOS apps: free, works offline.

Download on the App Store Get it on Google Play

Open DataCIQ

Printable sheet + ABB updates

Leave your email: get the link to the printable ABB error-code sheet and a heads-up when we add new codes and guides.

Double opt-in, zero spam, one-click unsubscribe.

The same fault on other brands

More ABB codes